Skip To Main Content

Header Holder

Header Right Column

Header Utility Nav

Container BTN

Toggle Search Container

Toggle Menu Container

Toggle Translate Container

Canvas Container Wrapper

Schools Canvas

Close Canvas Menu

Desktop Schools Tabs

Mobile Schools Accordions

Search Canvas

Translate Canvas

Close Canvas Menu

Translate

Explore this Section

Breadcrumb

Molasky History

1998

The MAGIC begins as Molasky JHS is under construction.

Molasky is truly a wonder as it was built in a year from the outside in. They did not have the right permits to start construction. Usually buildings have the pipes and wires put in first, then the concrete and last the exterior. The construction was not without setbacks and some worried it would not open in time. Mr. Molasky stepped in and corrected the permits once he visited the construction site and saw what was happening. 

After the first day of scheduled construction, the whole construction site was stopped. It was due to the presence of a burrowing owl and its family. 

Before Molasky opened, hot air balloons used to take off and land where our grass fields are today.

A dirt path leads to a modern brick building with a metal framework visible in the background.
In the foreground, a pathway is under construction with sand and white sheeting, while the background reveals a modern building with a covered walkway and trees.
A man speaks into a microphone in the foreground, while a woman stands beside him against a blurred yellow background.

Mr. and Mrs. Molasky came on the first day teachers reported to school to welcome us and meet each one of us. It was such an honor to meet them. Mr. Molasky charted a bus and treated the entire staff to a barbeque lunch at the Paiute Golf Course. 

Six people stand in the foreground in front of a decorated backdrop with a world map and stars.
Scaffolding surrounds a partially constructed brick building in the foreground, with a clear sky in the background.
In the foreground, concrete planters and debris are visible, while the background reveals a construction site with piles of sand and unfinished buildings.
A long, empty hallway with construction materials in the foreground and doors lining the walls leading to a bright exit in the background.
A bulldozer sits in the foreground amidst piles of dirt, with a large, arched-roof building under construction in the background.
Stacks of dark bricks and concrete mixers are in the foreground, with a large, dark structure under construction in the background.

Molasky Staff Memories

January 7, 2005

The first time it ever snowed at Molasky JHS

Ms. Gaura, Mrs. Schmutz, and Mrs. Wojotowitz had fun building a snowman in the Principal's truck. We had a few snowball fights too. 

Two people in winter coats stand next to a shopping cart filled with snow in a snowy field with houses in the background.
Two people in winter clothing stand in the snowy bed of a red pickup truck next to a snowman, with houses and cars visible in the snowy background.
A snowman wearing a Santa hat sits in the snow-covered bed of a red pickup truck, with houses and cars visible in the snowy background.
A snowman wearing a Santa hat sits in the bed of a red pickup truck, with snow-covered houses and cars in the background.
Snow falls on bare trees and bushes in the foreground, with a brick junior high school building in the background.
Snow falls on a brick building with a covered entrance and a planter box in the foreground.
Snow falls on snow-covered bushes in the foreground, with a chain-link fence and houses visible in the snowy background.
Snow falls on a fenced-in bicycle rack in front of a brick building.
Snow falls on bare trees and bushes in the foreground, with a colorful building visible in the background.
A person in a red jacket dances in the snow in the foreground, while a snow-covered parking lot with cars and houses fills the background.
Two empty wooden benches sit on a snow-covered ground in front of a chain-link fence, with buildings visible in the snowy background.